Industrial Doors for Warehousing & Distribution Centres
Every warehouse and 3PL operator in Ireland lives or dies on how quickly stock moves through the loading bays. Rayco Group specifies, installs and services complete door and dock packages built for high-cycle daily traffic without failure.
Built for the demands of warehousing & distribution
- High door cycles wearing out light-duty consumer-grade equipment
- Thermal loss and pest ingress from doors left open during picking
- Loading bay downtime costing thousands per hour of stopped trucks
- Insurance requiring documented planned maintenance
Product package for warehousing & distribution
40–80mm foam-injected panels rated for 25,000+ cycles/year with high-cycle spring packages.
Fabric rapid roll doors opening at 2–3 m/s to keep the warehouse envelope closed between picks.
Dock levellers, shelters, buffers, wheel guides and interlocks supplied under one contract.
Scheduled PPM contracts with digital job reports for insurance audit trails.
Warehousing & Distribution — frequently asked
Our high-cycle spring packages are rated for 25,000+ cycles per year — comfortable for 100+ cycles per day operations.
Yes — sectional door, high-speed internal door, dock leveller, shelter, buffers, wheel guides and interlocks all installed under one project manager.
Specifying doors for a warehousing & distribution facility?
Rayco Group engineers survey the site, model the duty cycle and put a fixed quote in your hands inside 48 hours.
