Fire Protection

Fire Rated Roller Doors

Certified fire-rated shutters and curtains from 60 to 240 minutes for warehouses, plant rooms and compartmentation lines in commercial buildings.

Overview

Engineered for industrial environments

Fire compartmentation is non-negotiable in industrial buildings. Our fire-rated roller shutters and fire curtains are third-party tested to EN 1634-1 and hold ratings from E60 up to EI240 for both integrity and insulation.

Systems are supplied with certified control panels, battery back-up, integrated smoke detection and fail-safe gravity descent — meeting the requirements of TGD-B, insurers and specifying architects.

We can retrofit into existing openings and coordinate with your fire alarm contractor so the completed installation forms part of the building's certified life safety strategy.

EN 1634-1 certified E60 – EI240
Fail-safe gravity descent
Battery back-up as standard
Fire alarm interfacing
Compact head-box options
Full commissioning certificate
Fire rated roller shutter installed in a commercial building
Industries served

Trusted across Ireland's most demanding sectors

WarehousingDistributionManufacturingFood ProcessingPharmaceuticalLogisticsRetail ParksAgriculturalAutomotive
Specifications

Built to spec, delivered to schedule

Every project is engineered to site — we survey, specify and install to the exact requirements of your facility, insurance and compliance obligations.

Certification
EN 1634-1 · CE / UKCA
Ratings
E60 / E120 / EI120 / EI240
Max size
Up to 20m × 8m
Descent
Controlled gravity fail-safe
Panel
Fire curtain fabric · Steel shutter
Alarm interface
Volt-free · Addressable
FAQ

Common questions from specifiers

Preparing a tender or a maintenance schedule? Our team publishes clear answers so you can specify with confidence.

Do we need certified drawings for building control?+

Yes. Every fire-rated door we supply comes with third-party test evidence and installer's certificate suitable for TGD-B compliance and insurance sign-off.

How often must fire shutters be serviced?+

Ireland's building regulations and BS 7273-4 require fire shutters to be tested and serviced at least every 6 months. Our maintenance contracts include full documentation for your fire log book.

Nationwide Response · Ireland

Ready to specify your industrial door project?

Talk to our engineering team today. Free site surveys, fast quotes and nationwide response.