Industrial Doors for Builders, Contractors and Developers
On a new-build or refurbishment, doors sit late in the programme but depend on decisions made early — structural openings, lintel heights, power supply and fixing substrate. Getting the specification in before the steel is fixed avoids expensive rework.
Built for the demands of builders, contractors & developers
- Openings set before the door package is specified
- Power supply and control positions not allowed for
- Programme slippage compressing the installation window
- Handover documentation required for building sign-off
- Multiple unit types across one development
Product package for builders, contractors & developers
Survey, specification and installation coordinated to your programme.
The full range specified across mixed unit types on one development.
Certified fire shutters and curtains where the fire strategy requires them.
Maintenance handed over to the occupier or managing agent after practical completion.
Builders, Contractors & Developers — frequently asked
Before structural openings are finalised. Lintel height, clear opening, fixing substrate and power position all affect what can be installed and at what cost.
A CE Declaration of Performance, commissioning record and O&M manual for each powered door, which the building occupier needs for insurance and safety files.
Specifying doors for a builders, contractors & developers facility?
Rayco Group engineers survey the site, model the duty cycle and issue a written quotation.
