Sector solutions

Industrial Doors for Builders, Contractors and Developers

On a new-build or refurbishment, doors sit late in the programme but depend on decisions made early — structural openings, lintel heights, power supply and fixing substrate. Getting the specification in before the steel is fixed avoids expensive rework.

Challenges we solve

Built for the demands of builders, contractors & developers

  • Openings set before the door package is specified
  • Power supply and control positions not allowed for
  • Programme slippage compressing the installation window
  • Handover documentation required for building sign-off
  • Multiple unit types across one development
FAQs

Builders, Contractors & Developers — frequently asked

When should the door package be specified?

Before structural openings are finalised. Lintel height, clear opening, fixing substrate and power position all affect what can be installed and at what cost.

What documentation is provided at handover?

A CE Declaration of Performance, commissioning record and O&M manual for each powered door, which the building occupier needs for insurance and safety files.

Nationwide Response · Ireland

Specifying doors for a builders, contractors & developers facility?

Rayco Group engineers survey the site, model the duty cycle and issue a written quotation.